Tagged: facilities

Temporary road closure: Circle Drive

Temporary road closure: Circle Drive

Already sent campuswide but repeated here for the benefit of any off-campus readers who might be traveling here in the next day or two: South Circle Drive, between Wood Hall Drive and Laboratory Sciences...

Road Closure reminders

Road Closure reminders

Instructional Services Court (which leads to the IS docks) will be closed for resurfacing on Thursday, July 5, and Friday, July 6. Theatre Hall Drive will be closed from July 2-July 6 for resurfacing. ...

It was a different era: Check out the Stroh’s truck

It was a different era: Check out the Stroh’s truck

Yesterday we posted an item about the Student Services roof repair and the accompanying rooftop improvements on the plaza to feature new plantings, gathering places and a student sculpture area. Well, we’ve posted a...

Repair, remodel on tap for Student Services roof plaza

Repair, remodel on tap for Student Services roof plaza

A familiar campus thoroughfare is set to become a destination as crews begin work this week. Remodeling began Monday (June 25) on the Student Services Building roof plaza, the football field-sized area between the University Union, Theatre Hall and the Cofrin Library. The area is being redone to address maintenance needs, but the project will offer much more, said facilities planner Aaron Epps.

Phoenix Room makeover

Phoenix Room makeover

The Phoenix Rooms in the University Union are presently off line all summer, or at least until the first week of August, for a remodeling project that will give the space a more modern...