Please note parking lot maintenance on Green Bay Campus
Starting May 16, 2022 there will be several maintenance projects occuring to University parking lots. The maintenance will consist of heat patching and crack filling the surfaces to prolong the lot’s life, correct known defects, and mitigate future damage. This will require the closure or partial closure of the parking lots.r
Tenative Schedule:
- Monday 5/16: Weidner Center for the Performing Arts (A & B Pods)
- Tuesday 5/17: Weidner Center for the Perfomring Arts (Stage Door)
- Wednesday 5/18: Walter Way (From Community Center North to 3336 Walter Way)
- Thursday 5/19: Wood Hall (East Half near building), Lab Sciences, University Union Visitor Lot
- Friday 5/20: Main Housing, Baird Foundation, Weidner Center for Performing Arts (Stage Door)
- Monday 5/23: Wood Hall Loading Dock, Shorewood/UREC Offices